The Bloomsbury Hotel

London, UK

bg-image

Designed in the 1930s by renowned British Architect, Sir Edwin Lutyens, The Bloomsbury Hotel already underwent a sensitive restoration to become the chic heritage hotel it is today. Retaining many of its original architectural features, the iconic hotel hosts a double-height lobby, elegant prohibition era bar, library and 153 guests rooms and suites. The hotel also hosts a variety of meetings rooms and event halls of all sizes, as well as fully equipped dining areas and kitchens.

Seeking comfort with improved environmental standards

The Doyle Collection, the owners of the hotel, wanted to lower the building's energy usage and cut CO2 emissions by 30%. They also sought to improve comfort levels for guests by optimising climate control in all guest rooms, meeting spaces, and in the bar and restaurant. Keeping to a nine-month programme was essential to ensure minimal revenue losses.

"The challenge for this project was to preserve the historic interior and exterior of the building. With Daikin VRV, we knew that we could easily take on this challenge and improve our system's energy efficiency. Along with Daikin UK, this was a great team effort—showing the benefit of a strong and lasting working relationship between client and contractor."

- Michael Neve, General Manager, The Bloomsbury Hotel

Fully efficient system replacement with minimal disruption

bg-image

For this project, we installed 56 outdoor units linked to 209 indoor ducted and wall-mounted concealed units in the guest rooms. For the communal areas we chose to install a mixture of wall-mounted and floor standing units.

Our VRV-Q system was the perfect choice for The Bloomsbury Hotel because the units are energy-efficient and flexible. Equipped with refrigerant R-410A but functioning at a pressure level like most refrigerant R-22 systems, VRV-Q units are 40% more efficient in heating and 25% more in cooling than an R-22 system.

Compact and lightweight, VRV-Q units are easy to install and cost-effective because they use existing piping and wiring. This means the renovation price was cut in half because it does not need a full pipe replacement. Installing the VRV-Q units floor-by-floor also allowed the hotel to stay open during the renovation.

Solution at a glance

bg-image
  • 209 indoor units (concealed ceiling + wall-mounted units)
  • 56 VRV III-Q replacement outdoor units (heat recovery)
  • Intelligent Touch Manager

Learn more

Our other cases

  • Crystal Tower

    To help Crystal Tower maximise its energy efficiency, we planned to combine the power of air-cooled VRV, water-cooled VRV and chillers to deliver an all-in-one climate control solution.
  • Helderberg Nature Reserve

    Daikin South Africa recently embarked on a fantastic project for the Helderberg Nature Reserve. In partnership with The Construction Company, NWE Consulting Engineers, and Coldfact Projects.
  • iThemba Labs

    At the very tip of Africa, lies NRF-iThemba LABS; a national facility known for its expertise in accelerator-based science and technologies.
  • JBC

    In its ongoing search to optimise running costs, JBC conducted a site trial with Daikin designed to evaluate the gains generated by Variable Refrigerant Temperature (VRT) technology.
  • Kapama River Lodge

    Daikin South Africa had a major project with Kapama Private Game Reserve in Limpopo Province, which spans a large region between the northern Drakensberg mountains and the Greater Kruger National Park in South Africa's north-east.
  • Leon's restaurant

    M&E contractor, Synecore, installed its first ‘invisible’ HVAC system, the Daikin VRV IV i-Series at Leon Restaurant, central London, to overcome tight space restrictions and achieve maximum climate control efficiency.
  • M&M Music Academy in Cape Town

    Together with Coastal Air Consulting and Consultmech engineers, we recently installed two 55kW rooftop package units at M&M Music Academy in Cape Town. We customized the units in order to compress the noise levels of the fan, while still maintaining the necessary size
  • Pick 'n Pay Panorama Upgrade

    The Daikin condensing unit was integrated, via Modbus, to the Eliwell controls supplied by Keystar. This allowed for remote access and monitoring of the plant, giving the owners and the contractors peace of mind.
  • Prezzemolo & Vitale - Palermo

    For the new Prezzemolo & Vitale store in the historical centre of Palermo, a system was installed consisting of Daikin Zeas and VRV units.
  • The New Chiller at Slanghoek Winery

    The new chiller, the largest Chinese Inverter Daikin South Africa has delivered to date, was a replacement of the one installed in the 1990s (also by Daikin). This inverter model was selected due to its high efficiency and low power consumption.
  • Taaibosch Daikin Air Conditioners

    Daikin supplies Taaibosch Winery in Stellenbosch with highly efficient, reliable and precise air conditioning solutions that provide them with complete temperature control in their cold room and offices.
  • Tafelberg Furnishers

    In October 2021, Daikin’s South African team did a major installation for one of the biggest independent furnishing retailers in Western Cape.
  • The Bloomsbury Hotel | VRV-Q system Installation

    The VRVIII Heat Recovery System from Daikin was selected for its supremely low energy consumption and ability to off er massive savings in comparison with similar systems
  • Torre Serenissima | VRV Air Conditioning System Installation

    Torre Serenissima had a VRV Air Conditioning System Installation. Daikin equipped with an outdated R-22 refrigerant system, we gave the Torre Serenissima a full upgrade to deliver more energy efficiency and comfort.
  • Hotel in Las Arenas, Valencia

    Supplying a complete HVAC system for an office building

    Daikin has recently supplied a complete solution for an office building of a Dutch company in the flower import/export business.
  • Hotel in Las Arenas, Valencia

    Las Arenas

    When it came to upgrading existing VRV systems to reduce maintenance costs and further improve comfort control, choosing a replacement solution with lower CO2 footprint was top of the agenda.
  • Providing a complete HVAC system for a food processing plant

    Daikin recently supplied a complete HVAC system to meet the cooling needs of a food processing plant in Hungary. The end user operates in the supplements business, producing plant-based supplements including vegan proteins.

Find more information

Download Pricelist

Need help?

Find more information

Download Pricelist

Need help?

Find more information

Download Pricelist

Need help?